
Demolition of the ceiling of the Atwater tunnel (Montreal, Quebec)
Period: August 2003 to May 2004
Equipment used: concrete recovering machining tool
|
|
Chute-à-Caron Dam
MIL Davie
Bagotville Base
Pierre-Laporte Bridge
Hydroelectric power station Draper
Atwater Tunnel
|