Rebuilding of the walls and floor of the Champlain dry dock of MIL Davie (Lévis, Quebec)

Work to be performed: concrete stripping of walls and drilling of dowels in walls and floor.

Period: June to November 2001

Challenges and special requirements:

  • Great precision was required to protect the granite steps and keep stripping depth to a minimum, thus reducing resurfacing costs

  • Stripping had to be done from the top and the bottom over a 50-foot high vertical plane

  • Methods had to be devised to work around obstacles and compensate for the reduced visibility of the work area when working from the top down

  • Vibrations and striking energy were a consideration when selecting the chisels

  • Deadlines could not be exceeded.

Equipment used:

  • Guiding frame with concrete machining tool
  • Hydraulic drilling autonomous tilting platform
  • CAT E120B excavator with hydraulic chisel
  • CAT E120B excavator with pneumatic drill
  • KX-41 excavator with pneumatic drill
  Chute-à-Caron Dam

  MIL Davie

  Bagotville Base

  Pierre-Laporte Bridge

  Hydroelectric power station
  Draper

  Atwater Tunnel



The guiding frame for machining tool at work on the walls of the Champlain dry dock
Click here to enlarge


Platform used at the Champlain dry dock of MIL Davie
Click here to enlarge


The guiding frame for machining tool at work
Click here to enlarge


Results of the work performed with the guiding frame for machining tool
Click here to enlarge


Company Profile
Our History
Our Team
Our Commitment
Awards Received
Equipment and Services
Innovation
Tilting Platforms
Guiding Frame
Concrete-Recovering Tool
Drilling Equipment
Excavators
Projects
New Projects
Completed Projects
Contact us Français