Rebuilding of the walls and floor of the Champlain dry dock of MIL Davie
(Lévis, Quebec)
Work to be performed: concrete stripping of walls and drilling of dowels in
walls and floor.
Period: June to November 2001
Challenges and special requirements:
- Great precision was required to protect the granite steps and keep stripping depth to a minimum, thus reducing resurfacing costs
- Stripping had to be done from the top and the bottom over a 50-foot high vertical plane
- Methods had to be devised to work around obstacles and compensate for the reduced visibility of the work area when working from the top down
- Vibrations and striking energy were a consideration when selecting the chisels
- Deadlines could not be exceeded.
Equipment used:
- Guiding frame with concrete machining tool
- Hydraulic drilling autonomous tilting platform
- CAT E120B excavator with hydraulic chisel
- CAT E120B excavator with pneumatic drill
- KX-41 excavator with pneumatic drill
|