Construction of a rainwater holding pond - No.1 and no.2 ponds - Bagotville
military base (Bagotville, Québec)
Work to be performed:
- Excavation of ponds
- Installation of overflow pipes
- Laying down of ballast
- Installation of a culvert
- Construction of an overflow trench
- Installation of a geomembrane
Period: October and November 2001
Challenge and special requirement:
Equipment used:
- Hydraulic excavator
- Bulldozer (tractor)
- Compactor
- 10-wheel truck
|